Our vision is not only to deliver a data centre campus — it is to provide a foundation for long-term digital infrastructure growth in the region
Situated at Juntion 24 of the M25 at The Ridgeway, Enfield, our development offers an ideal location for a next-generation data centre campus. The area benefits from strong connectivity, both in terms of power and digital infrastructure, with proximity to London while maintaining ample development space and access routes for logistics and services.
The campus has been designed with large-scale energy demands in mind. A 150MW - 300MW connection from Brimsdown Grid Supply Point (GSP) has already been quoted and reserved, with a phased delivery approach allowing for 150MW to be available by 2030, and full capacity achievable by 2033. This connection will be delivered via a dual 132kV circuit infrastructure, enabling secure, high-availability operations.
The proposed campus includes four buildings across two phases (Enfield and Hertsmere), each building designed for enterprise-grade data halls with up to 3.5MW of IT capacity per hall. The campus can support Tier 3 or Tier 4 resilience standards and integrates ancillary infrastructure such as generators, cooling plant, security buildings, and structured access points.
Powering Data. Empowering Business.
Copyright Orbital Data Centres Ltd. | All Rights Reserved | Privacy Policy